Update - 5/31/24

Forest Ridge/Huntington Area (Forest Ridge Rd, Huntington Rd, Essex Ct, Sterling Ct, and Foxhill Ct)

  • This week, the contractor milled all the streets in the area and completed paving the first layer of asphalt in the area.
  • Next week, the contractor is expected to finish paving the final asphalt layer in the area.

Royal Fox Area (Royal Fox Dr, Royal Fox Ct, Royal Troon Ct, Royal Lytham Dr, Royal Lytham Ct, Turnberry Rd, Royal Kings Ct, Royal Queens Ct, Royal Ashdown Ct)

  • This week, the contractor completed the remaining watermain valve replacement work. Residents that were affected by a scheduled water shut-down will be notified by a door tag once the boil order is lifted.
  • Repairs to damaged asphalt driveways and brick removal and replacement work is expected to begin next week.
  • Concrete removals & replacements are expected to resume for the area on the West side of Kirk Rd and on Turnberry Rd. Residents who will have impacts to driveway access will receive a door hanger with additional information regarding parking arrangements in advance before work restarts.
  • Next week, after all remaining concrete replacement work is completed, milling is expected to begin. The pavement on all streets in this area will be removed down to the stone (~3.5 inches) and temporary stone ramps will be constructed by the contractor for each driveway and onto connecting streets to maintain access.

Kings Area (King Edward Ave, King James Ave, King Alford Ct, King Williams Ct, King Richard Ct, King James Ct, Queen Anne Ct, King Henry Ln, King Charles Ln, King George Ln)

  • This week, utility structure adjustment/replacement work was completed in the area.
  • Next week, no work is expected for the area.

Walnut Hill Ave, Patricia Ln, Via Veneto Dr, Chandler Ave

  • Next week, watermain valve replacement work is expected to begin on Via Veneto Dr. Residents will be notified by door tags in advance of scheduled shut-downs. Door tags will include additional information regarding the shut-down. Utility structure adjustment/replacement work is expected to begin following the completion of the valve replacement work.